Medical & Commercial Centers

Glancy Outpatient and Scott Hudgens Professional Building

Outpatient Services Facility and Medical Office Tower

  • Facilities were the first completed phases of the current Gwinnett Medical Center–Duluth
  • Initial development of a 27-acre parcel at the intersection of Pleasant Hill and Howell Ferry Roads
  • Hayes | James provided
    • Master planning
    • Design for complete build-out of site
  • Development included
    • Construction documents for the initial 45,000 SF outpatient services facility
    • Documents included an 80,000 SF medical office tower
  • Services include
    • Design and permitting of two signalized intersections for the complex

Hamilton Mill Village Shopping Center

Commercial Development

  • 14.77-acre planned commercial development adjacent to Hamilton Mill residential complex in Gwinnett County
  • Over 105,000 square feet of commercial/retail space
    • 56,000 SF Publix retail facility
    • Out-parcels for McDonald’s and BP
  • Responsible for the site engineering and construction documents for the multi-tenant development
    • Over 33,000 SF of retail shop space
    • 6,000 SF restaurant out-parcel
    • Master storm water management plans
    • Overall traffic and parking coordination
  • Hayes | James provided
    • Initial coordination of the intersections along Hamilton Mill Parkway/S.R. 124
    • Site construction staking
    • Boundary surveys
    • Final platting
    • Complete permitting with the Georgia DOT and Gwinnett County

Hamilton Mill at Duncan Creek Retail Center

Commercial Development

  • 60-acre retail center
  • Site houses a Home Depot and Kohl’s department store as well as numerous smaller commercial businesses
  • Hayes | James provided
    • Preliminary site analysis
    • Planning
    • Site design
    • Construction phase services
    • Infrastructure design including
      • Four-lane entrance road
      • Left turn lanes along SR 124
      • Water, sewer, drainage, and gas and electrical utility layout and design
    • Graded pads for future building sites and storm water management for entire development
    • Design and permitting of a sanitary sewer pump station and force main
    • Assessment and permitting of wetlands disturbance

Gwinnett Medical Center Open Heart Surgery Expansion

Hospital Expansion

  • 40,000 SF, LEED Silver-certified, 4-story addition to the existing hospital facility
  • Project included the design of new power and gas service to the existing energy plant for the hospital
  • Hayes | James provided
    • Initial coordination of the existing site conditions
    • Survey verification of utilities and building infrastructure
    • Site permitting with Gwinnett County and City of Lawrenceville
  • Responsible for
    • Site engineering
    • Construction document coordination
    • Sanitary sewer force main and pump station design
    • Pedestrian and vehicular access
    • LEED document certification

Bramblett Shoals Commercial Site

Commercial Site

  • Preliminary concept prepared for a 35.6-acre parcel
  • Provided the initial coordination of the proposed roadway networks
  • Responsible for
    • Conceptual site plan totaling over 12.5 acres and included
      • Over 97,000 SF of center space
      • Approximately 11 outparcels
    • Preliminary grading for the shopping-center-based layout
    • Review of
      • Existing streams and wetlands
      • Roadway areas
      • Sanitary sewer connections study
      • Earthwork analysis
  • Hayes | James provided
    • Boundary and topographic surveys
    • Preliminary development review with Gwinnett County
    • Overall feasibility reports for client’s marketing package

Bramblett-Shoals-Commercial-Site_01


Rockdale Hospital East Wing Expansion

Hospital Expansion

  • Worked with CDH Architects to provide preliminary designs
  • Identified infrastructure and utility issues at the preliminary stage of the east wing expansion
  • Project was designed and permitted for construction
  • Project included two floors of hospital area and a four-level parking deck
  • Parking design included a new drop off area for the East Wing entrance
  • Provided construction phase services