Municipal & Mixed Used Development

Athens-Clarke County Jail System Advanced Housing Facility

Municipal Site

  • Site design services for the first phase of a 161,000 SF new jail facility
  • Project incorporated initial 17,820 SF Advance Housing Facility
  • Assisted the architect in the preparation of LEED documents
  • Followed requirements for storm water management and parking lot upgrade.
  • Provided site design services for
    • Water and sewer services
    • Storm water
    • Future connections for future buildout
  • Designed a bio-retention facility for Phase I
  • Prepared an overall tree management plan for the 90-acre complex
  • Provided construction phase services

Atlanta Job Corps Center

Multiuse Campus

  • 26.4-acre site located at the intersection of Washington Road and Roosevelt Highway located in Fulton County
  • Multiuse campus will contain
    • 12 buildings
    • Internal vehicular and pedestrian networks
    • Athletic fields and walking trails
    • Appropriate parking
  • Hayes | James is the civil engineering and landscape architectural consultant
  • Working with the architectural teams of
    • Smallwood Reynolds Stewart & Stewart
    • The Architects Group for the Georgia Department of Labor
  • Hayes | James’ responsibilities include
    • An evaluation of the existing master plan
    • Storm water management for four detention facilities
    • Overall infrastructure
  • Hayes | James is providing
    • Design documents according to EPA 438 regulations for storm water infiltration
    • Design coordination and updates according to
      • Fulton County Fire Marshall
      • GDOT
      • Fulton County
      • City of Atlanta
    • Final site construction documents for 11 of the first phase buildings including
      • 2 of the 3 dormitories
      • Welcome center building
      • Administration building
      • Education building
      • Child development center
      • Cafeteria and culinary arts
      • Recreation facility
      • Maintenance and storage facility
      • Central plant building
    • Anticipated total center square footage contained in the 12-building buildout is over 238,000 SF

Mill Village

Mixed-Use Development

  • Hayes | James prepared rezoning documents and site plans for this 3.6-acre site on Atlanta Street and Mill Street located inside the Historic Roswell Overlay District
  • Buildings designed to capture the historic details of the surrounding area
  • Mixed-use project of retail, office, residential and a hotel will be compatible with the historic character of the district
  • Design provided public green space and hardscape plaza areas
  • Parking needs addressed for this project with a five-level parking deck
  • Innovative design incorporates the spaces and maintains the integrity of the development

Mill-Village_01


Milton City Hall

New City Hall

  • Assisted architectural firm in site design of 23,000 SF city hall serving the City of Milton
  • Hayes | James provided
    • Site grading
    • Underground detention design
    • Utility/storm drainage layouts
    • Design for roadway connections to surrounding street networks
    • Permitting assistance to
      • Architectural team
      • City of Milton
      • Other jurisdictional agencies
  • Multiple building, parking and plaza areas are located within a 2.7-acre site
  • Design included coordination with the City of Milton and GDOT regarding the ongoing road design upgrade of frontage road, Branyon Trail

MiltonCityHall_02


Vickers

Mixed-Use Development

  • 1.9-acre mixed-use development located within the historic district of Roswell, at the corner of Woodstock and Canton Streets.
  • The two-building development consists of 139,000 SF of residential space on upper floors; 7,800 SF of retail on the ground level
  • Parking will be provided as a parking deck beneath the proposed development
  • Hayes | James has provided
    • ALTA survey
    • Tree survey
    • Conceptual grading plan
    • Landscape plan for the review by the City of Roswell
    • Design for a connector road that runs through the site
    • Large detention vault located below the parking deck level of one of the buildings
    • Coordination of the connection to existing utilities
    • Assistance with special use permitting prior to design
    • City permitting assistance
    • Construction phase services
  • Overall scope of the project consisted of
    • Site planning
    • Grading/drainage design
    • Utility coordination
    • Tree replacement plans
    • Erosion control plans
  • Attended several public hearings